Banner
Navigation
loco-info.com
The reference for locomotives and railcars

Great Northern (US) class 5000 boxcab

United States 1909 4 produced
General Electric works photo

For traffic through the Cascade Tunnel, the Great Northern received four four-axle boxcab electric locomotives in 1909. They were built by ALCO with their electrical equipment supplied by General Electric. Operating under 6,600 V three-phase AC at 25 Hz, each locomotive delivered 1,900 hp for an hour and 1,600 hp continuously. Power was transmitted via two trolley poles and the rails.

The locomotives were only used for the traffic in the tunnel and at both ends, steam locomotives took over. The electrified section through the tunnel was roughly three miles long and had a grade of 1.7 percent. Thanks to their multiple control equipment, three of the locomotives could be used to haul heavy freight trains at 15.7 mph (25.3 km/h). As train weights grew, all four locomotives were used together, but the speed had to be halved to 7.8 mph (12.6 km/h) to reduce the strain on the power supply.

Technical data

General

Built
1909
Manufacturers
mechanical part: ALCO, electrical part: General Electric
Wheel arrangement
B-B
Gauge
1,435 mm (Standard gauge)

Dimensions and weights

Length
13.46 m
Wheelbase
9.68 m
Service mass
104.3 t
Adhesion mass
104.3 t
Rigid wheelbase
3.35 m
Axle load
28.1 t

Power

Power source
electric - three-phase
Hourly power
1,417 kW (1,927 PS)
Continuous power
1,193 kW (1,622 PS)
Top speed
24 km/h
Starting effort
255.8 kN

Calculated values

Factor of adhesion
1 : 4.00
Power-to-weight ratio
13.6 kW/t
Adhesive weight/Total
1 : 1.00
Auf Deutsch umschalten

Settings

Your settings are retained for this browser session only.

Consent to cookies

We use cookies to save your display settings. If you decline, the settings are retained only for the current browser session.