Banner
Navigation
loco-info.com
The reference for locomotives and railcars

Rhaetian Railway Ge 2/4

Switzerland 1913 7 produced
Ge 2/4 on the SLM data sheet SBB Historic CC BY-SA 4.0

For its electrification of its line in the lower Engadine, the RhB ordered seven Ge 2/4 in 1910. These locomotives, which were delivered in 1913, were intended for passenger service and had half the traction equipment of the Ge 4/6. They had two driving axles powered by a common repulsion motor via a crank axle and coupling rods. One Bissel axle at each end ensured guidance in curves and proper weight distribution.

As it turned out that their power of 210 kW was not enough for passenger service even on flatter lines, they were increasingly used in shunting service. For this use, their repulsion motor was not suited at all due to its suboptimal starting characteristics and its very high consumption of coal brushes when changing direction very often. Additionally, the two cabs meant that the driver had to change the cab frequently when shunting.

To extend their service life, five were rebuilt in the forties where they got a completely new electric equipment including a single-phase motor. The reduced size of the new motor allowed to increase the top speed from 45 to 55 km/h. Two of these had been converted to switchers in the same process by changing the boxcab design for a central cab and lower hoods. This allowed the driver to switch the direction without moving from one to the other cab.

Since Chur station also had some tracks which led to the Arosa line which were electrified with DC, one of the shunters was equipped with batteries which were charged then running on the AC tracks. This changed its designation to Gea 2/4. In 1967, this one got a diesel engine instead of the batteries and was designated Gem 2/4.

The rebuilt boxcab locomotives were retired in the seventies and No. 222 was preserved and is operational. The two electric-only switchers were used into the eighties and one of these is on static display today. The Gem 2/4 was used until 2001 and then scrapped. The two non-rebuilt locomotives with the numbers 205 and 207 are preserved, but on static display.

Rebuilt Ge 2/4 No. 212 in June 1982 at Samedan J.J.Smit / CC BY-SA 4.0

Technical data

General

Property as built modernized rebuilt Gem 2/4
Built 1913 1945-1946 1967
Manufacturers mechanical part: SLM, electrical part: BBC mechanical part: SLM, RhB, electrical part: BBC, SAAS
Wheel arrangement 1-B-1
Gauge 1,000 mm (Meter gauge)

Dimensions and weights

Property as built modernized rebuilt Gem 2/4
Length 8.70 m
Wheelbase 6.00 m 5.80 m
Service mass 36.7 t 30 t 33 t
Adhesion mass 21.8 t 22 t 21 t
Axle load 10.9 t 11 t 10.5 t

Power

Property as built modernized rebuilt Gem 2/4
Power source electric - AC electric - AC + diesel-electric
Hourly power 210 kW (286 PS) 428 kW (582 PS) 219 kW (298 PS)
Top speed 45 km/h 55 km/h
Indicated power 154 kW (209 PS)

Calculated values

Property as built modernized rebuilt Gem 2/4
Power-to-weight ratio 5.7 kW/t 14.3 kW/t 6.6 kW/t
Adhesive weight/Total 1 : 1.68 1 : 1.36 1 : 1.57

Topics

  • electric locomotive
  • diesel locomotive
  • dual power
  • passenger
  • switcher
  • narrow gauge
CompareComment
Last changed: 10/2024

Watch on YouTube

Auf Deutsch umschalten

Settings

Your settings are retained for this browser session only.

Consent to cookies

We use cookies to save your display settings. If you decline, the settings are retained only for the current browser session.