Uganda Railway class M

Uganda 1912 18 produced

In 1912 and 1913, North British delivered a total of 18 0-6-6-0 Mallets to the Uganda Railway. They were of a standard design also built for other metre gauge operators in India, Burma and Spain. They were not superheated and had cylinders with diameters of 15 1/2 and 24 1/4 inches, respectively. Their power was enough to haul 170 tons up a long four percent incline at 6 mph. At only 2.5 percent, they could haul 200 tons at twice the speed. It did not take long until the KUR introduced Garratts which were more powerful and easier on maintenance. So the Mallets were already withdrawn in 1929 and 1930 and scrapped.

Technical data

General

Built
1912-1913
Manufacturers
North British
Wheel arrangement
0-6-6-0 (Erie)
Gauge
1,000 mm (Meter gauge)

Dimensions and weights

Wheelbase
7.39 m
Total wheelbase
14.81 m
Service mass
61.3 t
Adhesion mass
61.3 t
Total mass
93.5 t
Rigid wheelbase
2.52 m
Water capacity
9,093 l
Fuel capacity
4.1 t (coal)

Boiler

Grate area
3.066 m²
Firebox surface
10.684 m²
Tube heating surface
129.879 m²
Evaporative heating surface
140.562 m²
Total heating surface
140.6 m²

Power plant

Driver diameter
991 mm
Boiler pressure
12.4 bar
Expansion type
compound
Cylinders
four, HP: 394 x 508 mm and LP: 616 x 508 mm

Power

Power source
steam
Estimated power
597 kW (812 PS)
Starting effort
119.1 kN
Starting effort simple
142.9 kN

Calculated values

Factor of adhesion
1 : 5.05
Optimal speed
31 km/h
Power-to-weight ratio
9.7 kW/t
Heating Surface Equivalent
194.0 m²
Cylinder volume/HSE
1 : 1,417.94
Adhesive weight/Total
1 : 1.00
Tractive force/Heating surface
1 : 17.69
Grate area/Heating surface
1 : 45.85
Firebox/Tube surface
1 : 12.16
Auf Deutsch umschalten

Settings

Your settings are retained for this browser session only.

Consent to cookies

We use cookies to save your display settings. If you decline, the settings are retained only for the current browser session.