Banner
Navigation

Navigation

loco-info.com
The reference for locomotives and railcars

Imperial-Royal State Railways class 25 and Wien-Aspang Railway III / IIb

Austria-Hungary 1884 15 produced
kkStB 25.03 PD

In 1884, the kkStB procured twelve express locomotives for the Galician Transversal Railway in what is now Poland and the Ukraine. In the following year, the Vienna-Aspang Railway (EWA) had three identical locomotives built. The locomotives of the state railways were on Polish territory after the First World War and were immediately retired by the PKP. The two remaining EWA locomotives continued to be operated by the BBÖ and were only retired in 1949 and 1955. During World War II they were given the Reichsbahn numbers 53 7801 and 53 7802.

Technical data

General

Built
1884-1885
Manufacturers
StEG
Wheel arrangement
2-4-0 (Porter)
Gauge
1,435 mm (Standard gauge)

Dimensions and weights

Length
10.38 m
Empty mass
31.3 t
Service mass
36.1 t
Adhesion mass
25 t
Water capacity
9,300 l
Fuel capacity
4 t (coal)

Boiler

Grate area
1.73 m²
Firebox surface
7.3 m²
Tube heating surface
119 m²
Evaporative heating surface
126.3 m²
Total heating surface
126.3 m²

Power plant

Driver diameter
1,495 mm
Boiler pressure
10 bar
Expansion type
simple expansion
Cylinders
two, 400 x 632 mm

Power

Power source
steam
Top speed
60 km/h
Starting effort
57.5 kN

Calculated values

Factor of adhesion
1 : 4.27
Heating Surface Equivalent
162.8 m²
Cylinder volume/HSE
1 : 975.67
Adhesive weight/Total
1 : 1.44
Tractive force/Heating surface
1 : 9.51
Grate area/Heating surface
1 : 73.01
Firebox/Tube surface
1 : 16.30
Auf Deutsch umschalten

Settings

Your settings are retained for this browser session only.

Consent to cookies

We use cookies to save your display settings. If you decline, the settings are retained only for the current browser session.